Description
Chew Resistant and Wear-resistant: We had a chew test for 1 hour and the leash was not damaged. In fact, it depends on the degree of chewing and the temperament of the dog. For aggressive chewers (natural chewers), please choose carefully. Because some dogs chew all day long, and some dogs chew only once and leave. It is much better than other dog ropes in terms of chewability. After 100 friction tests, difficult to tear, super wear-resistant. Can be used in all weather conditions. Please rest a




